What We Do

Services

Everything we handle, from the first footing to the last coat of sealer.

Home › Services

Everything we take on

Every job below is one we do ourselves across Cabot.

Deck Installation

We set footings below frost depth, typically 24 to 36 inches around here, and frame with pressure-treated joists on 16-inch centers. Ledger boards get bolted through the rim joist with flashing tape, not just screwed to siding. You get a deck framed to hold the load, not just one that looks finished from the yard.

Deck Repair

Soft or spongy boards, railings that move when you lean on them, stairs that have pulled away from the frame, we fix all of it. Sometimes the fix is a handful of boards, sometimes the joists underneath are rotted and the whole top has to come off first. We'll tell you which one it is before we start, not after.

Deck Staining & Sealing

Arkansas sun and humidity will gray and cup untreated pine in two or three seasons. We pressure wash, let the wood dry out for a couple of days, then apply a penetrating stain or clear sealer depending on what you want it to look like. Composite skips this step entirely, which is part of why people switch.

Custom Deck Design

Multi-level decks, built-in bench seating, stairs that land where you actually want to walk instead of into the flower bed. We draw it out before we cut anything so you know where the posts land and how the railings run.

Composite Decking Installation

Trex and TimberTech boards go down with hidden fastener clips instead of face screws, so you don't get the screw-head pattern down the length of the deck. No sanding, no annual staining, just a wash with soap and water twice a year.

Deck Railing Installation & Repair

Baluster spacing has to stay under 4 inches and rail height at 36 inches minimum, and a lot of older decks around here don't meet that anymore. We'll rebuild to code, or install cable rail or glass panel if you want the view instead of the pickets.

Deck Board Replacement & Resurfacing

If the frame underneath is still solid, you don't need a whole new deck, just new boards on top of it. We match spacing and fastener pattern so it doesn't look like a patch job.

Deck Demolition & Removal

Old deck coming down to make way for a new one, or just coming down because it's not safe to stand on anymore. We haul off the old lumber so you're not stacking rotten boards against the fence.

Screened-In Porches & Deck Additions

Turning part of an open deck into a screened space keeps the bugs out without losing the outdoor feel. We tie the new framing into the existing deck structure instead of just building a box next to it.

Pergolas & Deck Shade Structures

Some decks get too hot to sit on by two in the afternoon. A pergola or shade structure over part of the deck fixes that without covering the whole thing.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Cabot, AR

Deck crews regularly out in these towns, not just Cabot.

Cabot, AR
Little Rock, AR
North Little Rock, AR
Conway, AR
Sherwood, AR
Jacksonville, AR
Searcy, AR
Beebe, AR
Lonoke, AR
Ward, AR
Vilonia, AR
Austin, AR
Common Questions

Things worth asking

Questions that come up once a project's actually underway.

Do I need a permit to build a deck in Cabot?
Most raised decks attached to a house require a building permit in Cabot and surrounding municipalities, especially if the deck is over 30 inches off the ground. Permit requirements and inspection timing vary by city, and the permit application is typically handled as part of the deck installation process.
How long does it take to build a deck?
A standard ground-level deck under 300 square feet usually takes one to two weeks from footing excavation to final board installation, weather allowing. Multi-level decks, composite decking with hidden fasteners, or built-in features like benches and pergolas add time, often pushing a project to three or four weeks.
Can you build a deck within a specific budget?
Deck size, decking material, and railing style can all be adjusted to hit a target budget, and that conversation happens before the quote is finalized. Pressure-treated pine, a simpler railing style, or a smaller footprint are the usual ways to bring a project in under a composite, multi-level design.
Do you guarantee your deck work?
Workmanship on deck installation and repair is covered for a set period after completion, stated in the written quote. Material warranties, like those on composite decking brands, are separate and come from the manufacturer, typically running 25 to 50 years against fading or staining.
Who do I talk to once the deck project starts?
One point of contact handles scheduling, material questions, and any changes once a deck project is underway, so there's no runaround between a sales person and the crew actually building it. That same person handles the final walkthrough when the deck is finished.
What decking materials do you work with?
Pressure-treated pine, cedar, and composite brands like Trex and TimberTech are all installed regularly, each with different cost and maintenance tradeoffs. Pressure-treated pine is the least expensive upfront but requires restaining every two to three years, while composite costs more initially but requires little more than periodic washing.
Can I still use my yard while the deck is being built?
Most of a yard stays usable during deck construction, though the immediate work area around footings and framing needs to stay clear for safety and equipment access. Pets and kids are best kept away from the active work zone until framing is complete and loose fasteners are cleaned up each day.
How should I prepare my property before deck construction starts?
Clearing furniture, grills, and potted plants away from the existing deck or build site makes the first day of work faster, and marking any sprinkler lines or buried cables near the footing locations helps avoid damage. Anything attached to the old deck, like string lights or planter boxes, should come down before demolition begins.
What happens if you find rotted framing once the old deck boards come off?
Rotted joists, a failing ledger board, or undersized footings found once the decking is removed get flagged before any new material goes down, with a revised quote for the additional framing work. This is common enough on repair and resurfacing jobs that it's worth budgeting some flexibility into the original estimate.
How do I maintain a deck after it's finished?
Pressure-treated and cedar decking should be cleaned and resealed every two to three years to prevent graying, cupping, and water absorption at the board ends. Composite decking just gets a wash with soap and water a couple times a year, and all decks benefit from keeping leaves and debris from piling up between the boards where moisture collects.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (501) 799-7810